Plan in numbers
Material planner
Measure your space and see how much material the job takes. Bring the numbers to your quote so we start on the same page.
How the numbers work
Behind the planner
| Material | Rule of thumb used |
|---|---|
| Hot mix asphalt | 2.35 tonnes per m³ compacted, plus 5% |
| Concrete | Volume plus 8%, shown in m³ and cubic yards |
| Granular A | 2.2 tonnes per m³ compacted |
| Pavers | Area plus 7% for cuts; 4.5 holland pavers per sq ft |
| Sod | 9 sq ft per roll, plus 5% |
| Topsoil and mulch | Sold by the cubic yard (0.765 m³) |
Got your numbers?
Send them with your quote request and we'll confirm everything on site.